Civil - Misc. equipment and support foundations. Also grout work for equipment and supports.
Structural Steel - erection of approximately 110 tons of pipe racks and steel at misc. elevations. Also approximately 200 misc. structural pipe supports.
Mechanical Equipment - setting and alignment of 149 pieces of equipment, including three large columns.
Piping - installation of approximately 45,000 linear feet of pipe. Pipe is located in new structure erected by IDC on previous contract, also located in new and existing pipe racks. IDC fabricated approximately half of the pipe installed for the project. The other half was fabricated in earlier stages to help expedite the project.